Conditions
Winter Activities
Shop Online
Al's Blog

Those Cool Rock Sections

Have you ever wondered how the Trail Crew builds those very nice sections of rock on the trails. The first step is to have the mini excavator operator over excavates a trail through the talus, setting the grade of the trail  (Photo 1). Once that is complete, the operator uses the machine to place large flat rocks in the over excavated section (Photo 2). Lastly, by hand, the Trail Crew staff adds a few more larger rocks and then fills the gaps with mineral soil and smaller rocks creating the final surface (Photo 3).

Photo 1

 

Photo 2

 

Photo 3